Installation Overview At a prominent confectionery site in York, Newsome has installed a efficient 400 kW chiller, marking the timely realisation of the project. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing operational resilience and ensuring measurable reductions in both power usage and carbon output. https://ariabookmarks.com/story6515515/high-efficiency-400-kw-chiller-installation-achieves-50k-annual-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut