This article considers the technology of early loading monolithic slabs using beam and rack timbering. The main principle is the next: after the concrete is cured to the required strength. the forms are removed and the support shores are installed for load transfer to the underlying floor slab. Such technique allows to form stripping at 60% concrete strength with shoring the upper flo... https://www.roneverhart.com/Craggy-Range-Sauvignon-Blanc-Te-Muna-Road-Vineyard-Martinborough-2022/