The first park has a capability of 200 MW when Sandrini II has a capability of one hundred MW. The full cost of both jobs were not disclosed even so, through construction, around two hundred staff have been used. The initiatives are envisioned to determine a handful of positions opening https://californiasolarcontractors.blogspot.com/2024/10/how-can-you-live-environment-friendly.html